← Back to the model

MODEL 01 / FULL RECORDED TAKEOFF

Commercial interior.
Measured in detail.

The complete recorded interior scope: areas, partition runs, finishes, demolition, equipment and coordinated MEP entries.

Anonymous model 01 matching this recorded takeoff
MODEL 01 / MATCHING PROJECT MEASUREMENTSOpen all 195 scope entries ↓
195ENTRIESFull recorded scope · 14 categories
91.293LFNew partition centerlines · four runs
1,752.622SFNew floor basis · mixed printed / traced
21OPENCoordination questions
Unpriced review example

Unpriced review example; measured, printed, allowance and reference quantities are identified. 195 scope entries, supporting measurements and 21 open questions. Reference, projection and planning rows are identified so they are not added to installed scope twice.

01 / MEASUREMENTS

Areas and wall runs. With their basis.

Inspect five room polygons and seventeen wall runs. Printed finish areas, traced polygons and height allowances stay distinct.

Anonymous redraw · one selected measurement at a time

The resized display is a measurement context, not a drawing to scale. Floor redraws retain simplified export geometry. The detailed source quantities and qualifications govern this review example.

Inspect all 22 measurement records
MeasurementTypeQuantityUnitLength LFHeight FTGross SFDeduction SFNet / bound SFDrawing
Room polygon562.197SF—Unmeasured———A301 / A101
Room polygon663.622SF—Unmeasured———A301 / A101
Room polygon538.191SF—Unmeasured———A301 / A101
Room polygon66.231SF—8———A301 / A101
Room polygon30.33SF—Unmeasured———A301 / A101
New partition28.893LF28.893UnmeasuredUnmeasuredUnmeasuredUnmeasuredA101
New partition35.769LF35.769UnmeasuredUnmeasuredUnmeasuredUnmeasuredA101
New partition0.809LF0.809UnmeasuredUnmeasuredUnmeasuredUnmeasuredA101
New partition25.822LF25.822UnmeasuredUnmeasuredUnmeasuredUnmeasuredA101
Existing wall4.57LF4.57UnmeasuredUnmeasuredUnmeasuredUnmeasuredA101
Existing wall57.475LF57.475UnmeasuredUnmeasuredUnmeasuredUnmeasuredA101
Existing wall35.849LF35.849UnmeasuredUnmeasuredUnmeasuredUnmeasuredA101
Existing wall0.338LF0.338UnmeasuredUnmeasuredUnmeasuredUnmeasuredA101
Existing wall14.356LF14.356UnmeasuredUnmeasuredUnmeasuredUnmeasuredA101
Existing wall57.937LF57.937UnmeasuredUnmeasuredUnmeasuredUnmeasuredA101
Existing wall8.949LF8.949UnmeasuredUnmeasuredUnmeasuredUnmeasuredA101
Existing wall5.641LF5.641UnmeasuredUnmeasuredUnmeasuredUnmeasuredA101
Existing wall4.111LF4.111UnmeasuredUnmeasuredUnmeasuredUnmeasuredA101
Existing wall11.031LF11.031UnmeasuredUnmeasuredUnmeasuredUnmeasuredA101
Existing wall7.769LF7.769UnmeasuredUnmeasuredUnmeasuredUnmeasuredA101
Existing wall13.556LF13.556UnmeasuredUnmeasuredUnmeasuredUnmeasuredA101
Existing wall7.769LF7.769UnmeasuredUnmeasuredUnmeasuredUnmeasuredA101
02 / FULL RECORDED SCOPE

All 195 entries.
With their basis.

Each quantity keeps its unit, drawing reference and status. Unmeasured lengths and heights stay open. A lump-sum scope package is not a measured component count.

Showing 195 of 195 entries
Item & descriptionQuantity / unitDrawingStatus, basis & note
H-D01 / HVACSupply duct 28x14 inShared scope23.077LFM101New horizontalScaled horizontal centerline

Horizontal centerline only. Vertical rises, offsets and fabrication fittings require elevations and coordinated shop drawings.

H-D02 / HVACSupply duct 16x12 inShared scope17.56LFM101New horizontalScaled horizontal centerline

Horizontal centerline only. Vertical rises, offsets and fabrication fittings require elevations and coordinated shop drawings.

H-D03 / HVACSupply duct 14x10 inShared scope33.027LFM101New horizontalScaled horizontal centerline

Horizontal centerline only. Vertical rises, offsets and fabrication fittings require elevations and coordinated shop drawings.

H-B01 / HVACSupply duct 8 in roundShared scope6.027LFM101New horizontalScaled horizontal centerline

Horizontal centerline only. Vertical rises, offsets and fabrication fittings require elevations and coordinated shop drawings.

H-B02 / HVACSupply duct 8 in roundShared scope3.987LFM101New horizontalScaled horizontal centerline

Horizontal centerline only. Vertical rises, offsets and fabrication fittings require elevations and coordinated shop drawings.

H-B03 / HVACSupply duct 8 in roundShared scope5.553LFM101New horizontalScaled horizontal centerline

Horizontal centerline only. Vertical rises, offsets and fabrication fittings require elevations and coordinated shop drawings.

H-B04 / HVACSupply duct 8 in roundShared scope3.967LFM101New horizontalScaled horizontal centerline

Horizontal centerline only. Vertical rises, offsets and fabrication fittings require elevations and coordinated shop drawings.

H-B05 / HVACSupply duct 8 in roundShared scope3.967LFM101New horizontalScaled horizontal centerline

Horizontal centerline only. Vertical rises, offsets and fabrication fittings require elevations and coordinated shop drawings.

H-B06 / HVACSupply duct 8 in roundShared scope6.87LFM101New horizontalScaled horizontal centerline

Horizontal centerline only. Vertical rises, offsets and fabrication fittings require elevations and coordinated shop drawings.

H-B07 / HVACSupply duct 8 in roundShared scope8.063LFM101New horizontalScaled horizontal centerline

Horizontal centerline only. Vertical rises, offsets and fabrication fittings require elevations and coordinated shop drawings.

H-B08 / HVACSupply duct 8 in roundShared scope10.343LFM101New horizontalScaled horizontal centerline

Horizontal centerline only. Vertical rises, offsets and fabrication fittings require elevations and coordinated shop drawings.

H-B09 / HVACSupply duct 8 in roundShared scope11.357LFM101New horizontalScaled horizontal centerline

Horizontal centerline only. Vertical rises, offsets and fabrication fittings require elevations and coordinated shop drawings.

H-B10 / HVACSupply duct 8 in roundShared scope7.63LFM101New horizontalScaled horizontal centerline

Horizontal centerline only. Vertical rises, offsets and fabrication fittings require elevations and coordinated shop drawings.

H-B11 / HVACSupply duct 8 in roundShared scope4.427LFM101New horizontalScaled horizontal centerline

Horizontal centerline only. Vertical rises, offsets and fabrication fittings require elevations and coordinated shop drawings.

H-B12 / HVACSupply duct 8 in roundShared scope4.427LFM101New horizontalScaled horizontal centerline

Horizontal centerline only. Vertical rises, offsets and fabrication fittings require elevations and coordinated shop drawings.

H-B13 / HVACSupply duct 8 in roundShared scope17.82LFM101New horizontalScaled horizontal centerline

Horizontal centerline only. Vertical rises, offsets and fabrication fittings require elevations and coordinated shop drawings.

H-B14 / HVACSupply duct 6 in roundShared scope18.874LFM101New horizontalScaled horizontal centerline

Horizontal centerline only. Vertical rises, offsets and fabrication fittings require elevations and coordinated shop drawings.

H-R01 / HVACReturn duct 18x12 inShared scope10.132LFM101New horizontalScaled horizontal centerline

Horizontal centerline only. Vertical rises, offsets and fabrication fittings require elevations and coordinated shop drawings.

H-E01 / HVACExhaust duct 10 in roundShared scope19.83LFM101New horizontalScaled horizontal centerline

Horizontal centerline only. Vertical rises, offsets and fabrication fittings require elevations and coordinated shop drawings.

H-E02 / HVACExhaust duct 10 in roundShared scope3.647LFM101New horizontalScaled horizontal centerline

Horizontal centerline only. Vertical rises, offsets and fabrication fittings require elevations and coordinated shop drawings.

H-E03 / HVACExisting_Exhaust duct 4 in roundShared scope9.617LFM101Existing / confirm extentScaled horizontal centerline

Existing toilet exhaust route. Retained in the latest duct schedule; confirm any replacement extent. Excluded from new-duct total.

H-EQ01 / HVACExisting Carrier 48TMF008-A-501 rooftop unit, 7.5 ton: retain/service/rebalanceShared scope1EAM401 / M102Existing to remainSchedule

2630 SA / 1510 OA / 1120 RA CFM. MCA 40.1, MOCP 45, 208V/3ph VIF. No new RTU purchase in base scope.

H-EQ02 / HVACNew Greenheck G-120-VG exhaust fan or approved equalShared scope1EAM401New; final variant pendingSchedule

1500 CFM at 0.5 in w.g.; 115/1/60; MCA 8.2; MOCP 15; 65 lb. Includes compatible curb, backdraft damper, screen, isolation and speed control; disconnect by EC. Exact catalog variant requires supplier confirmation.

H-T01 / HVACS-1 Titus TMS-AA 24x24 supply diffusersShared scope13EAM101 / M401NewPlan count

H-T02 / HVACS-2 Titus TMS-AA 12x12 supply diffuserShared scope1EAM101 / M401New; exact model pendingPlan count

Scheduled 12 x 12 in S-2 face retained. Exact material, frame and catalog model require clarification (H09).

H-T03 / HVACR-1 Titus 50F 24x24 return grillesShared scope2EAM101 / M401NewPlan count

H-T04 / HVACE-1 Titus 50F 24x24 exhaust grillesShared scope2EAM101 / M401NewPlan count

H-T05 / HVACE-2 Titus 50F 12x12 exhaust grille / existing toilet fan interfaceShared scope1EAM101 / M401Existing / confirmPlan count

H-A01 / HVACManual balancing dampers at supply air devicesShared scope14EAM101 / M301 / M401NewCount / specified scope

Verify damper access in finished ceiling; volume dampers also required in exhaust branches.

H-A02 / HVACExhaust branch balancing dampersShared scope2EAM101 / M301 / M401NewCount / specified scope

E-1 branch VD symbols.

H-A03 / HVACMotorized damper MD-1 interlocked to EF-1Shared scope1EAM101 / M301 / M401NewCount / specified scope

M101 keynote 10; coordinate power and controls.

H-A04 / HVACDuct smoke detector System Sensor DH100ACDCLP or equalShared scope1EAM101 / M301 / M401NewCount / specified scope

Furnished/installed MC, wired EC for RTU shutdown.

H-A05 / HVACRelocate/reuse thermostat and humidistatShared scope1SETM101 / M301 / M401Retain / relocate; condition pendingCount / specified scope

Provide new 7-day programmable thermostat if unsuitable; replacement is contingent.

H-A06 / HVACReuse return/space remote temperature sensorShared scope1EAM101 / M301 / M401Retain / relocate; condition pendingCount / specified scope

Replace if damaged; VIF before bid.

H-A07 / HVAC6x6 in door transfer grilleShared scope1EAM101 / M301 / M401NewCount / specified scope

M101 keynote 6.

H-A08 / HVAC12x12 in exhaust riser to roof fanShared scope1ASSEMBLYM101 / M301 / M401NewCount / specified scope

Vertical length and elevation not given; do not treat as 0 LF.

H-A09 / HVAC4 in rigid dryer exhaust riser with gooseneck and backdraft damperShared scope1ASSEMBLYM101 / M301 / M401NewCount / specified scope

35 ft maximum equivalent length per drawing; actual vertical length, elbows and route require field measurement.

H-A10 / HVACExisting toilet exhaust fan: protect and retainShared scope1EAM101 / M301 / M401Retain / relocate; condition pendingCount / specified scope

75 CFM on M401 vs 40 CFM at E-2 on M101.

H-A11 / HVACRTU/EF/MD interlock and timeclock sequenceShared scope1SETM101 / M301 / M401NewCount / specified scope

Coordinate MC/EC/GC responsibility; occupied-operation requirements per M401.

H-A12 / HVACCertified testing, adjusting and balancing, written reportShared scope1LSM101 / M301 / M401NewCount / specified scope

Balance all outlets and existing RTU; close out discrepancies with engineer.

H-A13 / HVACRTU inspection, cleaning, MERV-13 filters and condensate flushShared scope1LSM101 / M301 / M401NewCount / specified scope

Existing drain replacement if required not quantified.

H-A14 / HVACR-8 external insulation to concealed supply/return ductShared scope653.684SFM101 / M301 / M401Provisional horizontal surfaceClear-inside duct perimeter x horizontal LF

R-8 insulation horizontal surface only; final outside dimensions, thickness, verticals and fitting allowances require shop drawings.

H-A15 / HVACAcoustic lining of mainsShared scope25.132LFM101 / M301 / M401Provisional; drawing conflict H04M30115ft supply + traced10.132ft return main

Carry M30115ft supply plus allreturn10.132ft. M101instead10fteach; resolve lining extent/thickness before shop drawing.

H-A16 / HVACFire/smoke dampers and firestopping at rated crossingsShared scope1LSM101 / M301 / M401ConditionalConditional rated-wall crossing scope

Fire/smoke damper count depends on actual rated barrier crossings; do not treat thisLS allowance as one damper. One LS is a scope package; damper count remains unmeasured.

H-A17 / HVACFlexible diffuser connectorsShared scope1LSM101 / M301 / M401ConditionalConditional concealed connectors

Use rigid visible ducts. Concealed flex per final connection detail only, maximum5ft each; no supported installedLF given. One LS is a scope package, not a measured connector length.

D-H01 / DemolitionRemove existing split AC system, indoor/outdoor units, line set and controlsShared scope1SYSTEMM101 note 11 / M102 note 9DemolishPlan note

Refrigerant recovery, roof patches and disconnect coordination included in scope.

G-01 / GeneralTenant improvement gross areaShared scope2,011SFA000Reference only; nonadditivePrinted project area

Do not use gross area as net flooring or ceiling purchase quantity. Reference detail / vendor schedule, not an additional purchase quantity.

G-02 / GeneralPermit, landlord coordination, submittals, protection, cleanup and closeoutShared scope1LSA000 / A001NewResponsibility matrix

D-01 / DemolitionRemove existing flooring and prepare substrate, excluding retained restroomShared scope1,752.622SFA100 / A301DemolishNet finish-area basis

Confirm removal limits at rear service area; disposal and substrate remediation separate.

D-02 / DemolitionDemolish indicated existing partitions and patch adjoining finishesShared scope57.101LFA100DemolishA100 scaled gross centerlines

Four traced former-room/cross-partition runs. Gross57.10LF; two door openings measured separately; height and concealed conditions VIF.

D-03 / DemolitionRemove dashed existing interior door leaves / framesShared scope2EAA100DemolishPlan count

Confirm two indicated doors and hardware salvage.

D-04 / DemolitionRemove existing millwork, countertops and nonretained sinksShared scope1LSA100 note 19DemolishPlan note

D-05 / DemolitionRemove existing water heater and cap/modify connectionsShared scope1EAA100DemolishPlan note

E101 instead describes existing heater relocation: RFI P02.

A-W01 / Drywall & framing3A retail/grooming partitionShared scope28.893LFA101NewScaled source wall centerline

Ceiling height + 6 in board extension; stud/bracing/ceiling height VIF. Two board faces.

B-W01 / Drywall & framing5/8 in board faces, 3A retail/grooming partitionShared scope449.187SFA101 details 3A/3BAllowance8.5 ft display-height allowance

8 ft ceiling + 6 in extension is an editable takeoff allowance, not a documented project wall height; door deductions 3x7 ft where shown.

A-W02 / Drywall & framing3A grooming/wash partitionShared scope35.769LFA101NewScaled source wall centerline

Ceiling height + 6 in board extension; stud/bracing/ceiling height VIF. Two board faces.

B-W02 / Drywall & framing5/8 in board faces, 3A grooming/wash partitionShared scope566.071SFA101 details 3A/3BAllowance8.5 ft display-height allowance

8 ft ceiling + 6 in extension is an editable takeoff allowance, not a documented project wall height; door deductions 3x7 ft where shown.

A-W03 / Drywall & framingPartition junction returnShared scope0.809LFA101NewScaled source wall centerline

Ceiling height + 6 in board extension; stud/bracing/ceiling height VIF. Two board faces.

B-W03 / Drywall & framing5/8 in board faces, Partition junction returnShared scope13.752SFA101 details 3A/3BAllowance8.5 ft display-height allowance

8 ft ceiling + 6 in extension is an editable takeoff allowance, not a documented project wall height; door deductions 3x7 ft where shown.

A-W04 / Drywall & framing3B wash wall liningShared scope25.822LFA101NewScaled source wall centerline

Ceiling height + 6 in board extension; stud/bracing/ceiling height VIF. One board face.

B-W04 / Drywall & framing5/8 in board faces, 3B wash wall liningShared scope219.489SFA101 details 3A/3BAllowance8.5 ft display-height allowance

8 ft ceiling + 6 in extension is an editable takeoff allowance, not a documented project wall height; door deductions 3x7 ft where shown.

A-INS / Drywall & framingSound attenuation insulation at new insulated partitionsShared scope514.505SFA101Allowance8.5 ft height allowance

Insulated hatch on main new partitions; STC42 or better per detail. Confirm thickness, stud gauge and spacing.

A-TRK / Drywall & framingTop and bottom track, excluding bracingShared scope182.587LFA101Allowance2 x gross wall centerline

Stud gauge/spacing and bracing not supplied as an invented fabrication quantity.

A-DR1 / Doors & glazingD1 single flush 3x7 wood door, frame and hardwareShared scope1EAA101NewDoor elevation / plan count

McKinney hinges, Schlage F10LAT625, LCN4041XALXSNB per A101; verify current approvals.

A-DR2 / Doors & glazingD2 3x7 double-acting wood/glass door, frame and spring hingesShared scope1EAA101NewDoor elevation / plan count

Three Bommer 3029-3 spring hinges per A101; 6x6 transfer grille coordination.

A-RET / Doors & glazingExisting storefront, rear exit and restroom doorsShared scope4EAA101ExistingDoor elevation / plan count

Storefront1, rear1, restroom/service doors2 as drawn; protect and retain. Verify operation.

F-01 / FlooringFC-1 MSI Prescott Sandino 7x48 LVT: retailShared scope555SFA301NewPrinted net area

F-02 / FlooringFC-1 MSI Prescott Sandino 7x48 LVT: groomingShared scope663.622SFA101 / A301NewScaled clear floor polygon

M401 ventilation area736SF is a different source basis; not substituted for finish-area takeoff.

F-03 / FlooringFC-2 Braxton Saddle Beige porcelain 10x40: wash/dryShared scope534SFA301NewPrinted net area

Restroom existing flooring to remain despite schedule generic location text.

F-04 / FlooringLVT order allowance including 10% wasteShared scope1,340.484SFA301 + allowanceAllowance10% editable purchasing allowance

F-05 / FlooringPorcelain order allowance including 10% wasteShared scope587.4SFA301 + allowanceAllowance10% editable purchasing allowance

F-06 / FlooringFloor preparation and adhesive / mortar / groutShared scope1,752.622SFA301NewNet flooring area

F-07 / FlooringB-1 Roppe PV4010 Serenity black 4 in baseShared scope312.387LFA301MeasuredClear room perimeter less 4 door openings

Gross finish boundary less12LF openings; confirm deductions behind fixed casework/tubs and retained service areas.

F-08 / FlooringFloor transitions at LVT / tile and retained restroomShared scope6LFA101 / A301AllowanceTwo 3 ft doorway transitions

Confirm exact transition locations/profiles.

P-FRP / Wall finishesMarlite P100 white smooth FRP floor-to-ceiling in wash areaShared scope813.16SFA301Allowance8 ft ceiling-height allowance

Perimeter trace less two3x7 door equivalents; revise for retained masonry, service alcove, actual ceiling and accessory openings.

P-01 / PaintingRetail and grooming wall paint, primer + two coatsShared scope1,655.936SFA301 / A401Allowance8 ft height allowance

PT1 SW6583 In the Pink / PT2 SW7000 Ibis White. Split color by elevations; do not add both coats as duplicate wall area.

P-02 / PaintingPT5 Hot Lips 2077-30 finish to new partition doors and framesShared scope2SETSA301 / A101NewTwo new door assemblies

P-03 / PaintingPT4 Iron Ore exposed deck/ducts where no ceiling occursShared scope1LSA301Separate / conditional scopeConditional scope

Do not price the entire deck as exposed while RCP depicts retained ceiling grid.

C-01 / CeilingsExisting ceiling/grid retained areas: protect, alter and patch for MEPShared scope717.196SFA100 / A201Existing / modifyA100 retained-grid boundary polygon

Traced retained shaped ceiling717.20SF; restroom retained66.23SF separately. Protect/alter/patch for devices. Actual tile salvage VIF.

C-02 / CeilingsNew Armstrong Optima 24x24x5/8 tile with Prelude XL15/16 gridShared scope1,077.144SFA201 / A001Measured / coordinateClear reflected ceiling area less retained polygons

Total clear room footprint minus A100 retained-grid717.20SF and retained restroom66.23SF. New ACT distribution/edge conditions and ceiling elevations require field/RCP coordination.

C-03 / CeilingsCoordinate 19 HVAC terminals and 29 scheduled new lights with ceilingsShared scope1LSA201 / M101NewCoordination scope

PL-01 / PlumbingDST-1 Flying Pig FP701 50 in grooming tubs with FPKIT02 faucetShared scope3EAP101 / P401 / P601NewPlan/schedule count

Owner-supplied per architectural furniture schedule; plumber connects.

PL-02 / PlumbingDST-2 Flying Pig FP301 38 in grooming tubs with FPKIT02 faucetShared scope2EAP101 / P401 / P601NewPlan/schedule count

Owner supplied; verify all five tub locations against approved equipment.

PL-03 / PlumbingLT-1 Zurn Z1176 hair/lint interceptorsShared scope5EAP101 / P401 / P601ConflictPlan/schedule count

P601 schedule says4; P101 note14 calls one under each of5 tubs. Carry5 pending RFI.

PL-04 / PlumbingFD-1 Josam 30000-A-4-50 floor drainsShared scope2EAP101 / P401 / P601NewPlan/schedule count

P101 two3in FD callouts; include trap primer / seals per final selection.

PL-05 / PlumbingWB-1 washer drain/supply box with hammer arrestorsShared scope1EAP101 / P401 / P601NewPlan/schedule count

Coordinate actual appliance NEMA and connection requirements.

PL-06 / PlumbingDF-1 Elkay EZSTL8W(VR)K bottle-fill water coolerShared scope1EAP101 / P401 / P601NewPlan/schedule count

New3/4in CW,3in sanitary and2in vent connections indicated.

PL-07 / PlumbingWH-1 AO Smith DEN-120 electric storage water heaterShared scope1EAP101 / P401 / P601ConflictPlan/schedule count

P601119gal,16kW,208/3/60,50GPH at100F rise; A301qty2 and E101reuse conflict.

PL-08 / PlumbingET-1 5 gal thermal expansion tankShared scope1EAP101 / P401 / P601NewPlan/schedule count

P601 water-heater schedule.

PL-09 / PlumbingRCP-1 Armstrong H20-20SS recirculation pumpShared scope1EAP101 / P401 / P601NewPlan/schedule count

1GPM,10ft TDH,1/12HP,120V1ph; aquastat and timeclock.

PL-10 / PlumbingWater-heater mixing valve, isolation, check and drain packageShared scope1EAP101 / P401 / P601ConflictPlan/schedule count

Confirm setpoint: P401120F vs revised P601note110F.

PL-11 / PlumbingExisting water closet, lavatory and mop sinkShared scope3EAP101 / P401 / P601ExistingPlan/schedule count

Retain; reconnect existing hot-water branches to new source where required.

PL-12 / PlumbingDomestic CW/HW/HWR mains and fixture branchesShared scope1LSP101 / P401 / P601PendingUnmeasured vertical/interface scope

Horizontal pipes broken out below. This line covers vertical fixture drops/rises, isolation valves, final tie-ins and fittings not dimensioned. Field measure vertical lengths; no duplicate horizontal allowance.

PL-13 / PlumbingSanitary main, fixture branches and ventsShared scope1LSP101 / P401 / P601PendingUnmeasured vertical/interface scope

Horizontal sanitary/vent route quantities broken out below. This line covers unmeasured rises/drops, traps, fittings, supports and tie-ins.

PL-14 / PlumbingConcrete sawcut, excavation, bedding, backfill and slab patch at new drainsShared scope78.296LFP101 / P401 / P601Measured / allowanceBelow-slab sanitary route length

Sanitary routeLF only; trench width/depth, overlapping branches, existing slab thickness, reinforcing and vapor barrier repair VIF. Do not treatLF as excavationCF or patchSF.

PL-15 / PlumbingPressure tests, disinfection, flushing and commissioningShared scope1LSP101 / P401 / P601NewPlan/schedule count

P000/P001/P101 and manufacturer requirements.

EL-R1 / Electrical & lightingExisting recessed lighting - protect / retainShared scope43EAA201 / E102 / E601ExistingA201 schedule count

Vendor/model and retained extent to coordinate with September E-series.

EL-F1 / Electrical & lighting2x2 TCP LED flat panelsShared scope9EAA201 / E102 / E601NewA201 schedule count

Vendor/model and retained extent to coordinate with September E-series.

EL-F2 / Electrical & lighting2x2 TCP emergency battery panelsShared scope6EAA201 / E102 / E601NewA201 schedule count

Vendor/model and retained extent to coordinate with September E-series.

EL-F4 / Electrical & lightingTCP emergency panel;2x4 specification vs plan symbol verifyShared scope1EAA201 / E102 / E601NewA201 schedule count

Vendor/model and retained extent to coordinate with September E-series.

EL-P1 / Electrical & lightingLivex5012-03 chandelier over treat tableShared scope1EAA201 / E102 / E601NewA201 schedule count

Vendor/model and retained extent to coordinate with September E-series.

EL-T1 / Electrical & lightingAttain LED track heads; ConTech track systemShared scope12EAA201 / E102 / E601NewA201 schedule count

Vendor/model and retained extent to coordinate with September E-series.

EL-POWER / Electrical & lightingConvenience duplex/quad/GFCI receptacles and associated circuitsShared scope42EAE101 / E102 / E501 / E601Counted / verifyE101 circuit-tagged receptacle locations

Counted printed A# tags excluding heater/pump/timeclock connection labels. Includes dedicated appliance locations; duplex/quad/GFCI types shown on plan. No conductor/conduit lengths inferred from tag count.

EL-EM / Electrical & lightingExit and emergency egress lights XW/XEW/XWLShared scope7EAE101 / E102 / E501 / E601Counted / verifyE102 field tags; legend excluded

Field symbol tags {'XW': 3, 'XEW': 3, 'XWL': 1}. E102legend explicitly excluded. Final mounting and backup per E601.

EL-CAM / Electrical & lightingOwner-provided security cameras; GC installation and low voltageShared scope13EAE101 / E102 / E501 / E601CoordinatePlan scope / count pending

A201 NC plan markers; confirm count with security vendor.

EL-HVAC / Electrical & lightingNew exhaust-fan, motorized-damper and timeclock power/control connectionsShared scope1LSE101 / E102 / E501 / E601CoordinatePlan scope / count pending

M101/M401/E101 interface scope.

EL-RTU / Electrical & lightingExisting RTU feeder and disconnect: verify/reuseShared scope1LSE101 / E102 / E501 / E601CoordinatePlan scope / count pending

208V3ph;45A MOCP on M401. Electrical notes refer existing panelL2 while labels showA: reconcile.

EL-WH / Electrical & lightingWater-heater feeder and disconnect scopeShared scope1LSE101 / E102 / E501 / E601CoordinatePlan scope / count pending

E101 saysrelocate existing; P601new16kW208/3 heater. Do not assume spare capacity.

EL-LV / Electrical & lightingTelecom demarc conduit and security/data pathwaysShared scope1LSE101 / E102 / E501 / E601CoordinatePlan scope / count pending

3in demarc conduit; POS3/4in power and2in data conduit. Routes/lengths VIF.

EL-CTRL / Electrical & lightingOccupancy/daylight/room controls, relays and emergency interfacesShared scope1LSE101 / E102 / E501 / E601CoordinatePlan scope / count pending

E102/E501/E601 schedule components; exact quantities pending controls zoning count.

EL-TEST / Electrical & lightingElectrical tests, labels, emergency lighting and control commissioningShared scope1LSE101 / E102 / E501 / E601CoordinatePlan scope / count pending

E000/E001/E002/E501.

FF-100 / Millwork & equipmentGridwall2x6 with hooksShared scope14EAA301Reference only; nonadditiveArchitectural furniture schedule

Supply ownership does not remove installation, blocking or MEP coordination. Reference detail / vendor schedule, not an additional purchase quantity.

FF-101 / Millwork & equipmentGridwall2x6 with shelvesShared scope5EAA301Reference only; nonadditiveArchitectural furniture schedule

Supply ownership does not remove installation, blocking or MEP coordination. Reference detail / vendor schedule, not an additional purchase quantity.

FF-102 / Millwork & equipmentCustom built style fixtureShared scope1EAA301Reference only; nonadditiveArchitectural furniture schedule

Supply ownership does not remove installation, blocking or MEP coordination. Reference detail / vendor schedule, not an additional purchase quantity.

FF-103 / Millwork & equipment48in food shelf displayShared scope1EAA301Reference only; nonadditiveArchitectural furniture schedule

Supply ownership does not remove installation, blocking or MEP coordination. Reference detail / vendor schedule, not an additional purchase quantity.

FF-104 / Millwork & equipmentSingle-door reach-in freezerShared scope1EAA301Reference only; nonadditiveArchitectural furniture schedule

Supply ownership does not remove installation, blocking or MEP coordination. Reference detail / vendor schedule, not an additional purchase quantity.

FF-105 / Millwork & equipmentTreat tableShared scope1EAA301Reference only; nonadditiveArchitectural furniture schedule

Supply ownership does not remove installation, blocking or MEP coordination. Reference detail / vendor schedule, not an additional purchase quantity.

FF-106 / Millwork & equipmentCelebration tableShared scope1EAA301Reference only; nonadditiveArchitectural furniture schedule

Supply ownership does not remove installation, blocking or MEP coordination. Reference detail / vendor schedule, not an additional purchase quantity.

FF-107 / Millwork & equipmentCustom farmers market fixtureShared scope1EAA301Reference only; nonadditiveArchitectural furniture schedule

Supply ownership does not remove installation, blocking or MEP coordination. Reference detail / vendor schedule, not an additional purchase quantity.

FF-108 / Millwork & equipmentFreestanding gondolaShared scope1EAA301Reference only; nonadditiveArchitectural furniture schedule

Supply ownership does not remove installation, blocking or MEP coordination. Reference detail / vendor schedule, not an additional purchase quantity.

FF-109 / Millwork & equipmentSpinning fixtureShared scope1EAA301Reference only; nonadditiveArchitectural furniture schedule

Supply ownership does not remove installation, blocking or MEP coordination. Reference detail / vendor schedule, not an additional purchase quantity.

FF-200 / Millwork & equipmentHydraulic drying tables groomingShared scope13EAA301Reference only; nonadditiveArchitectural furniture schedule

Supply ownership does not remove installation, blocking or MEP coordination. Reference detail / vendor schedule, not an additional purchase quantity.

FF-201 / Millwork & equipmentOverhead armsShared scope14EAA301Reference only; nonadditiveArchitectural furniture schedule

Supply ownership does not remove installation, blocking or MEP coordination. Reference detail / vendor schedule, not an additional purchase quantity.

FF-202 / Millwork & equipmentRolling groomer cartsShared scope10EAA301Reference only; nonadditiveArchitectural furniture schedule

Supply ownership does not remove installation, blocking or MEP coordination. Reference detail / vendor schedule, not an additional purchase quantity.

FF-207 / Millwork & equipmentOval mirrorsShared scope10EAA301Reference only; nonadditiveArchitectural furniture schedule

Supply ownership does not remove installation, blocking or MEP coordination. Reference detail / vendor schedule, not an additional purchase quantity.

FF-211 / Millwork & equipmentVeterinary scaleShared scope1EAA301Reference only; nonadditiveArchitectural furniture schedule

Supply ownership does not remove installation, blocking or MEP coordination. Reference detail / vendor schedule, not an additional purchase quantity.

FF-300 / Millwork & equipmentGrooming wash tubsShared scope5EAA301Reference only; nonadditiveArchitectural furniture schedule

Supply ownership does not remove installation, blocking or MEP coordination. Reference detail / vendor schedule, not an additional purchase quantity.

FF-301 / Millwork & equipmentShampoo rack3XShared scope1EAA301Reference only; nonadditiveArchitectural furniture schedule

Supply ownership does not remove installation, blocking or MEP coordination. Reference detail / vendor schedule, not an additional purchase quantity.

FF-302 / Millwork & equipmentWall shelves wash areaShared scope5EAA301Reference only; nonadditiveArchitectural furniture schedule

Supply ownership does not remove installation, blocking or MEP coordination. Reference detail / vendor schedule, not an additional purchase quantity.

FF-303 / Millwork & equipmentHydraulic drying tables wash areaShared scope4EAA301Reference only; nonadditiveArchitectural furniture schedule

Supply ownership does not remove installation, blocking or MEP coordination. Reference detail / vendor schedule, not an additional purchase quantity.

FF-304 / Millwork & equipmentWall-mounted force air dryersShared scope4EAA301Reference only; nonadditiveArchitectural furniture schedule

Supply ownership does not remove installation, blocking or MEP coordination. Reference detail / vendor schedule, not an additional purchase quantity.

FF-307 / Millwork & equipmentFull kennel banksShared scope3EAA301Reference only; nonadditiveArchitectural furniture schedule

Supply ownership does not remove installation, blocking or MEP coordination. Reference detail / vendor schedule, not an additional purchase quantity.

FF-308 / Millwork & equipmentWasher/dryerShared scope1EAA301Reference only; nonadditiveArchitectural furniture schedule

Supply ownership does not remove installation, blocking or MEP coordination. Reference detail / vendor schedule, not an additional purchase quantity.

FF-310 / Millwork & equipmentKennel dryersShared scope2EAA301Reference only; nonadditiveArchitectural furniture schedule

Supply ownership does not remove installation, blocking or MEP coordination. Reference detail / vendor schedule, not an additional purchase quantity.

FF-311 / Millwork & equipmentWater heaters - architectural scheduleShared scope2EAA301Reference only; nonadditiveArchitectural furniture schedule

Supply ownership does not remove installation, blocking or MEP coordination. Conflicts with1WH-1 on P601. Reference detail / vendor schedule, not an additional purchase quantity.

FF-312 / Millwork & equipmentExisting mop sinkShared scope1EAA301Reference only; nonadditiveArchitectural furniture schedule

Supply ownership does not remove installation, blocking or MEP coordination. Reference detail / vendor schedule, not an additional purchase quantity.

ROOF-01 / Roofing & life safetyNew exhaust-fan curb, penetration and flashingShared scope1EAA000 / A001 / M102NewScope / field quantity

Confirm EF-1/EF-2 tag; owner roofing contractor per M000; compatible curb by fan supplier.

ROOF-02 / Roofing & life safetyDryer gooseneck roof penetration and flashingShared scope1EAA000 / A001 / M102NewScope / field quantity

At least18in above finished roof per M102; maintain intake separation.

ROOF-03 / Roofing & life safetyExisting RTU curb/roof patching only if unsoundShared scope1LSA000 / A001 / M102Separate / conditional scopeScope / field quantity

Condition-dependent alternate; no whole-roof replacement included.

FIRE-01 / Roofing & life safetyFire suppression modifications, delegated design and separate permitShared scope1LSA000 / A001 / M102Separate / conditional scopeScope / field quantity

A000 deferred submittal. No sprinkler layout/count supplied.

FIRE-02 / Roofing & life safetyFire alarm/life-safety scope as required by AHJShared scope1LSA000 / A001 / M102Separate / conditional scopeScope / field quantity

A000 says no existingfirealarm; M101ductsmokedetector required. Separate design/coordination.

SIGN-01 / Roofing & life safetyExterior signage under separate permitShared scope1LSA000 / A001 / M102Separate / conditional scopeScope / field quantity

A000; do not fabricate sign dimensions/quantity.

SIGN-02 / Roofing & life safetyInterior brand signage and blockingShared scope1LSA000 / A001 / M102NewScope / field quantity

A003 signage schedule, owner provided; GC installs as responsibility matrix.

C-04 / CeilingsExisting restroom ceiling retainedShared scope66.231SFA100 / A201ExistingScaled room polygon

Existing8ftAFF only confirmed height callout.

C-05 / Ceilings24x24 ACT purchasing allowance,10% wasteShared scope297TILESA201Allowance4SF tile,10% editable waste

This is a purchasing allowance after new/retained boundary reconciliation; grid/hangers per approved layout.

PL-CW-M / Plumbing1-1/4in cold-water trunkShared scope38.593LFP101MeasuredCalibrated horizontal route trace

Plan centerline only; add actual fixture drops, risers and offsets after field heights. Caption1/4in differs from registered PDF scale; A101 registration used.

PL-HW-M / Plumbing1in hot-water trunkShared scope32.593LFP101MeasuredCalibrated horizontal route trace

Plan centerline only; add actual fixture drops, risers and offsets after field heights. Caption1/4in differs from registered PDF scale; A101 registration used.

PL-HWR-M / Plumbing3/4in hot-water recirculation trunkShared scope31.852LFP101MeasuredCalibrated horizontal route trace

Plan centerline only; add actual fixture drops, risers and offsets after field heights. Caption1/4in differs from registered PDF scale; A101 registration used.

PL-SAN-M / Plumbing4in sanitary main, below slabShared scope41.778LFP101MeasuredCalibrated horizontal route trace

Plan centerline only; add actual fixture drops, risers and offsets after field heights. Caption1/4in differs from registered PDF scale; A101 registration used.

PL-CW-T / Plumbing1/2in cold-water tub branchesShared scope28.519LFP101MeasuredCalibrated horizontal route trace

Plan centerline only; add actual fixture drops, risers and offsets after field heights. Caption1/4in differs from registered PDF scale; A101 registration used.

PL-HW-T / Plumbing1/2in hot-water tub branchesShared scope26.667LFP101MeasuredCalibrated horizontal route trace

Plan centerline only; add actual fixture drops, risers and offsets after field heights. Caption1/4in differs from registered PDF scale; A101 registration used.

PL-SAN-T / Plumbing2in sanitary tub branchesShared scope24.074LFP101MeasuredCalibrated horizontal route trace

Plan centerline only; add actual fixture drops, risers and offsets after field heights. Caption1/4in differs from registered PDF scale; A101 registration used.

PL-V-T / Plumbing2in vent main and tub branchesShared scope49.556LFP101MeasuredCalibrated horizontal route trace

Plan centerline only; add actual fixture drops, risers and offsets after field heights. Caption1/4in differs from registered PDF scale; A101 registration used.

PL-CW-DF / Plumbing3/4in cold-water drinking-fountain branchShared scope5.704LFP101MeasuredCalibrated horizontal route trace

Plan centerline only; add actual fixture drops, risers and offsets after field heights. Caption1/4in differs from registered PDF scale; A101 registration used.

PL-WASH / Plumbing3/4in CW/HW washer branchesShared scope6.296LFP101MeasuredCalibrated horizontal route trace

Plan centerline only; add actual fixture drops, risers and offsets after field heights. Caption1/4in differs from registered PDF scale; A101 registration used.

PL-SAN-FD / Plumbing3in floor-drain/washer/drinking-fountain branchesShared scope12.444LFP101MeasuredCalibrated horizontal route trace

Plan centerline only; add actual fixture drops, risers and offsets after field heights. Caption1/4in differs from registered PDF scale; A101 registration used.

PL-PAN / PlumbingWater-heater pan, drain, leak detection and vacuum/relief provisionsShared scope1SETP501MeasuredDetail scope

Final pan/drain requirements and relief routing to coordinate with selected equipment.

PL-TRAPS / Plumbing2in tub fixture traps and connectionsShared scope5SETSP101 / P401MeasuredFive tub connections

Hair/lint interceptor count conflict remainsP01; do not double-count included fixture trap kits.

PL-VALVES / PlumbingFixture stops/branch isolation and service valvesShared scope1LSP001 / P501MeasuredSpecified accessory scope

Final valve count follows coordinated piping/isolation arrangement.

PL-TIE / PlumbingExisting water/vent/sanitary field connection packagesShared scope1LSP101MeasuredThree system interfaces

Exact locations and conditionVIF; includes existing-restroom hot-water reconnection.

E-CIR-23 / Electrical detailE101 device locations on circuit A#23Shared scope13LOCATIONSE101Reference only; nonadditivePrinted circuit tags

Detail of EL-POWER, not additive to its total. Final device type, existing/new condition and circuit identifiers VIF. Reference detail / vendor schedule, not an additional purchase quantity.

E-CIR-34 / Electrical detailE101 device locations on circuit A#34Shared scope2LOCATIONSE101Reference only; nonadditivePrinted circuit tags

Detail of EL-POWER, not additive to its total. Final device type, existing/new condition and circuit identifiers VIF. Reference detail / vendor schedule, not an additional purchase quantity.

E-CIR-36 / Electrical detailE101 device locations on circuit A#36Shared scope1LOCATIONSE101Reference only; nonadditivePrinted circuit tags

Detail of EL-POWER, not additive to its total. Final device type, existing/new condition and circuit identifiers VIF. Reference detail / vendor schedule, not an additional purchase quantity.

E-CIR-15 / Electrical detailE101 device locations on circuit A#15Shared scope5LOCATIONSE101Reference only; nonadditivePrinted circuit tags

Detail of EL-POWER, not additive to its total. Final device type, existing/new condition and circuit identifiers VIF. Reference detail / vendor schedule, not an additional purchase quantity.

E-CIR-32 / Electrical detailE101 device locations on circuit A#32Shared scope1LOCATIONSE101Reference only; nonadditivePrinted circuit tags

Detail of EL-POWER, not additive to its total. Final device type, existing/new condition and circuit identifiers VIF. Reference detail / vendor schedule, not an additional purchase quantity.

E-CIR-30 / Electrical detailE101 device locations on circuit A#30Shared scope1LOCATIONSE101Reference only; nonadditivePrinted circuit tags

Detail of EL-POWER, not additive to its total. Final device type, existing/new condition and circuit identifiers VIF. Reference detail / vendor schedule, not an additional purchase quantity.

E-CIR-40 / Electrical detailE101 device locations on circuit A#40Shared scope1LOCATIONSE101Reference only; nonadditivePrinted circuit tags

Detail of EL-POWER, not additive to its total. Final device type, existing/new condition and circuit identifiers VIF. Reference detail / vendor schedule, not an additional purchase quantity.

E-CIR-9 / Electrical detailE101 device locations on circuit A#9Shared scope3LOCATIONSE101Reference only; nonadditivePrinted circuit tags

Detail of EL-POWER, not additive to its total. Final device type, existing/new condition and circuit identifiers VIF. Reference detail / vendor schedule, not an additional purchase quantity.

E-CIR-11 / Electrical detailE101 device locations on circuit A#11Shared scope3LOCATIONSE101Reference only; nonadditivePrinted circuit tags

Detail of EL-POWER, not additive to its total. Final device type, existing/new condition and circuit identifiers VIF. Reference detail / vendor schedule, not an additional purchase quantity.

E-CIR-7 / Electrical detailE101 device locations on circuit A#7Shared scope3LOCATIONSE101Reference only; nonadditivePrinted circuit tags

Detail of EL-POWER, not additive to its total. Final device type, existing/new condition and circuit identifiers VIF. Reference detail / vendor schedule, not an additional purchase quantity.

E-CIR-37 / Electrical detailE101 device locations on circuit A#37Shared scope1LOCATIONSE101Reference only; nonadditivePrinted circuit tags

Detail of EL-POWER, not additive to its total. Final device type, existing/new condition and circuit identifiers VIF. Reference detail / vendor schedule, not an additional purchase quantity.

E-CIR-39 / Electrical detailE101 device locations on circuit A#39Shared scope1LOCATIONSE101Reference only; nonadditivePrinted circuit tags

Detail of EL-POWER, not additive to its total. Final device type, existing/new condition and circuit identifiers VIF. Reference detail / vendor schedule, not an additional purchase quantity.

E-CIR-27 / Electrical detailE101 device locations on circuit A#27Shared scope1LOCATIONSE101Reference only; nonadditivePrinted circuit tags

Detail of EL-POWER, not additive to its total. Final device type, existing/new condition and circuit identifiers VIF. Reference detail / vendor schedule, not an additional purchase quantity.

E-CIR-13 / Electrical detailE101 device locations on circuit A#13Shared scope1LOCATIONSE101Reference only; nonadditivePrinted circuit tags

Detail of EL-POWER, not additive to its total. Final device type, existing/new condition and circuit identifiers VIF. Reference detail / vendor schedule, not an additional purchase quantity.

E-CIR-10 / Electrical detailE101 device locations on circuit A#10Shared scope1LOCATIONSE101Reference only; nonadditivePrinted circuit tags

Detail of EL-POWER, not additive to its total. Final device type, existing/new condition and circuit identifiers VIF. Reference detail / vendor schedule, not an additional purchase quantity.

E-CIR-33-35 / Electrical detailE101 device locations on circuit A#33,35Shared scope1LOCATIONSE101Reference only; nonadditivePrinted circuit tags

Detail of EL-POWER, not additive to its total. Final device type, existing/new condition and circuit identifiers VIF. Reference detail / vendor schedule, not an additional purchase quantity.

E-CIR-41 / Electrical detailE101 device locations on circuit A#41Shared scope1LOCATIONSE101Reference only; nonadditivePrinted circuit tags

Detail of EL-POWER, not additive to its total. Final device type, existing/new condition and circuit identifiers VIF. Reference detail / vendor schedule, not an additional purchase quantity.

E-CIR-31 / Electrical detailE101 device locations on circuit A#31Shared scope1LOCATIONSE101Reference only; nonadditivePrinted circuit tags

Detail of EL-POWER, not additive to its total. Final device type, existing/new condition and circuit identifiers VIF. Reference detail / vendor schedule, not an additional purchase quantity.

E-CIR-38 / Electrical detailE101 device locations on circuit A#38Shared scope1LOCATIONSE101Reference only; nonadditivePrinted circuit tags

Detail of EL-POWER, not additive to its total. Final device type, existing/new condition and circuit identifiers VIF. Reference detail / vendor schedule, not an additional purchase quantity.

E-EM-XW / Electrical detailXW emergency/exit tagged locationsShared scope3EAE102Reference only; nonadditiveE102 field tags; legend excluded

Detail of EL-EM; verify exact mounting and backup model. Reference detail / vendor schedule, not an additional purchase quantity.

E-EM-XEW / Electrical detailXEW emergency/exit tagged locationsShared scope3EAE102Reference only; nonadditiveE102 field tags; legend excluded

Detail of EL-EM; verify exact mounting and backup model. Reference detail / vendor schedule, not an additional purchase quantity.

E-EM-XWL / Electrical detailXWL emergency/exit tagged locationsShared scope1EAE102Reference only; nonadditiveE102 field tags; legend excluded

Detail of EL-EM; verify exact mounting and backup model. Reference detail / vendor schedule, not an additional purchase quantity.

EL-WIRE / Electrical & lightingBranch conductor and conduit runsShared scopeUnmeasuredLFM101 / E101PendingUnmeasured routing

Circuit/source/endpoints shown, routing and vertical rises not dimensioned. Field/shop routing required; included as a quantity hold, not a zero.

EL-DEM / Electrical & lighting3in telecom demarc conduit allowanceShared scope1RUNM101 / E101CoordinateAccessory scope

Route, length and tie-in pointVIF.

EL-DATA / Electrical & lightingPOS data pathways and pull stringsShared scope1SETM101 / E101CoordinateAccessory scope

Owner vendor confirms low-voltage cable category and device count.

HV-FIT / HVACHVAC elbows, taps, transitions, caps and supportsShared scope1LSM101 / E101CoordinateAccessory scope

Fittings/supports included in full duct scope; shape/offset/shop pattern not finally defined by schematic plan. One LS records the scope package, not one fitting or a final fabrication count.

HV-DROP / HVACHVAC vertical rises and diffuser dropsShared scopeUnmeasuredLFM101 / M102 / M301PendingUnmeasured routing

Vertical lengths remain unmeasured. Field elevations, route and offsets are required; not zero LF.

FF-POS / Millwork & equipmentGC-built L-shaped POS cash wrap, solid-surface top, wood face and internal lightingShared scope1LSA001 / A301 / A401 / A701Allowanced assemblyA701 details2/3/4/9/12; approved shop dimensions and countertop seams

Distinct from owner treat table and FF102/107 fixtures. Corian Modern White or approved equal; framing, plywood, slat/T&G face, drawer/blocking and internal lighting included.

FF-TRIM / Millwork & equipment1x8 wall trim to retail and salon/groomingShared scope205.492LFA001 / A401AllowanceRoom perimeters217.492LF less12LFopening allowance

Gross run allowance; verify storefront exclusions, inside/outside corners and actual trim extent before order.

A-BRACE / Drywall & framingPartition head restraint / bracing to existing structureShared scope1LSA101 / A601Field-dependent allowanceRequired bracing scope; deck elevation and final layout unconfirmed

Do not invent brace count or attachment capacity; obtain reviewed shop/structural attachment details.

A-BLOCK / Drywall & framingMetal backing straps and accessory/equipment blockingShared scope1LSA101 / A401 / A601 / A701Allowanced assemblySource-required backing at shelves, gridwall, mirrors, restroom accessories and millwork

Detailed accessory backing separated from stud/track quantities; dimensions and locations by final equipment shop drawings.

FF-RR-MIR / Millwork & equipmentGC-furnished Bobrick B-290 2448 restroom mirrorShared scope1EAA101ScheduledRestroom specification names24x48 mirror

Different from the10owner-supplied oval salon mirrors. Existing WC/lav/grab bars remain.

P-FRP-G / Wall finishesGrooming-kennel FRP backing / finish extent reserveShared scope1LSA001 / A301Field-dependent allowanceFRP material schedule lists grooming kennels; exact extent to confirm

Wash-room FRP priced separately. Confirm grooming kennel surfaces and height before firm purchase.

LIFE-EXT / Roofing & life safetyPortable fire extinguishers, brackets and identificationShared scope2EAA000 / A004AllowancePlanning quantity from2011SF and project notes; fire department locations/quantity approval required

Carry4A60BC per cover legend; confirm exact approved rating and count. Not part of sprinkler head quantities.

SI-COUNT / Roofing & life safetyInterior signage schedule count cross-checkShared scope26EAA401Nonadditive detailRT10-14=5; GR1-5=10; GR11-14=4; GR15=2; GR16=1; BR1-3=3; RR1=1

Procurement/install scope already in SIGN02. GR10/GR17/BR4 scheduled zero are not ordered.

SF = square feet; LF = linear feet; EA = count; LS = lump-sum scope package. SF-PROJ is a plan projection, not developed installed surface. Reference schedules and procurement allowances are nonadditive to their parent scope.

03 / SUPPORTING REGISTERS

The detail behind
the scope.

Measurements, deductions and planning inputs expand the same scope. They are not additional purchases.

Room area bases · 5 rows

Printed finish areas and traced clear polygons are different bases. No unexplained subtraction is presented as a measured deduction.

AreaTraced SFRecorded finish SFDrawingQualification
AREA-01562.197555A301 / A101Printed and traced finish bases may differ; overall drawing discrepancy open
AREA-02663.622663.622A301 / A101Printed and traced finish bases may differ; overall drawing discrepancy open
AREA-03538.191534A301 / A101Printed and traced finish bases may differ; overall drawing discrepancy open
AREA-0466.23165A301 / A101Printed and traced finish bases may differ; overall drawing discrepancy open
AREA-0530.3330.33A301 / A101Printed and traced finish bases may differ; overall drawing discrepancy open
Wall and nominal opening register · 17 rows

Four new and thirteen existing wall records. All installation heights remain unverified; six nominal openings are coordination records.

WallScopeLength LFConfirmed height FTOpenings EANominal widths FTDrawingQualification
W01New28.893Unmeasured13A101Field verification required
W02New35.769Unmeasured13A101Field verification required
W03New0.809Unmeasured0A101Field verification required
W04New25.822Unmeasured0A101Field verification required
EX01Existing4.57Unmeasured0A101Field verification required
EX02Existing57.475Unmeasured0A101Field verification required
EX03Existing35.849Unmeasured0A101Field verification required
EX04Existing0.338Unmeasured0A101Field verification required
EX05Existing14.356Unmeasured0A101Field verification required
EX06Existing57.937Unmeasured13.33A101Field verification required
EX07Existing8.949Unmeasured0A101Field verification required
EX08Existing5.641Unmeasured0A101Field verification required
EX09Existing4.111Unmeasured0A101Field verification required
EX10Existing11.031Unmeasured13.33A101Field verification required
ER1Existing7.769Unmeasured0A101Field verification required
ER2Existing13.556Unmeasured13A101Field verification required
ER3Existing7.769Unmeasured13A101Field verification required
Mechanical route register · 21 rows

The same 21 runs are detailed in the mechanical model takeoff. Existing exhaust is excluded from new-duct quantities; this supporting schedule is not additional scope.

RunSystemClear sizeHorizontal LFDrawingScope
H-D01supply28 x 14 in23.077M101New horizontal
H-D02supply16 x 12 in17.56M101New horizontal
H-D03supply14 x 10 in33.027M101New horizontal
H-B01supply8 in6.027M101New horizontal
H-B02supply8 in3.987M101New horizontal
H-B03supply8 in5.553M101New horizontal
H-B04supply8 in3.967M101New horizontal
H-B05supply8 in3.967M101New horizontal
H-B06supply8 in6.87M101New horizontal
H-B07supply8 in8.063M101New horizontal
H-B08supply8 in10.343M101New horizontal
H-B09supply8 in11.357M101New horizontal
H-B10supply8 in7.63M101New horizontal
H-B11supply8 in4.427M101New horizontal
H-B12supply8 in4.427M101New horizontal
H-B13supply8 in17.82M101New horizontal
H-B14supply6 in18.874M101New horizontal
H-R01return18 x 12 in10.132M101New horizontal
H-E01exhaust10 in19.83M101New horizontal
H-E02exhaust10 in3.647M101New horizontal
H-E03existing_exhaust4 in9.617M101Existing / confirm extent
Plumbing route basis · 11 rows

P101 background registers at 13.5 PDF points per foot, despite its printed scale caption. The scale conflict remains an open question.

RouteSystemHorizontal LFDrawing / PDF pagePDF points / FTTraced pathsQualification
PL-CW-MCW38.593P101 / physical PDF p1813.51Calibrated horizontal trace only; risers, drops, offsets, fittings and tie-ins remain separate.
PL-HW-MHW32.593P101 / physical PDF p1813.51Calibrated horizontal trace only; risers, drops, offsets, fittings and tie-ins remain separate.
PL-HWR-MHWR31.852P101 / physical PDF p1813.51Calibrated horizontal trace only; risers, drops, offsets, fittings and tie-ins remain separate.
PL-SAN-MSAN41.778P101 / physical PDF p1813.51Calibrated horizontal trace only; risers, drops, offsets, fittings and tie-ins remain separate.
PL-CW-TCW28.519P101 / physical PDF p1813.55Calibrated horizontal trace only; risers, drops, offsets, fittings and tie-ins remain separate.
PL-HW-THW26.667P101 / physical PDF p1813.55Calibrated horizontal trace only; risers, drops, offsets, fittings and tie-ins remain separate.
PL-SAN-TSAN24.074P101 / physical PDF p1813.55Calibrated horizontal trace only; risers, drops, offsets, fittings and tie-ins remain separate.
PL-V-TV49.556P101 / physical PDF p1813.56Calibrated horizontal trace only; risers, drops, offsets, fittings and tie-ins remain separate.
PL-CW-DFCW5.704P101 / physical PDF p1813.51Calibrated horizontal trace only; risers, drops, offsets, fittings and tie-ins remain separate.
PL-WASHCW/HW6.296P101 / physical PDF p1813.52Calibrated horizontal trace only; risers, drops, offsets, fittings and tie-ins remain separate.
PL-SAN-FDSAN12.444P101 / physical PDF p1813.54Calibrated horizontal trace only; risers, drops, offsets, fittings and tie-ins remain separate.
04 / BEFORE RELEASE

21 questions.
Still visible.

Drawing conflicts, field dimensions and trade interfaces stay with the quantities until they are resolved.

H01 / OPEN

EF-1(N) on floor plan/schedule versus EF-2(N) on roof plan

Confirm single new fan tag and location before ordering.

M101 / M102 / M401
H02 / OPEN

Floor exhaust grilles 875 + 585 = 1,460 CFM versus fan 1,500 CFM; toilet E-2 shows 40 versus 75 CFM balance

Engineer to issue corrected outlet and exhaust balancing values.

M101 / M401
H03 / OPEN

Air-balance total supply row 2,400 CFM conflicts with 2,630 CFM RTU, ventilation table and 14 supply devices

Use 2,630 as documented sum for review; request corrected schedule, no redesign implied.

M401 / M101
H04 / OPEN

M101: 10 ft main acoustic lining versus M301: all return + first 15 ft supply

Confirm lining extent, thickness and final clear-inside duct dimensions.

M101 / M301
H05 / OPEN

M101: 8 in retail branches at 280 CFM versus M401 neck-size table 10 in for 201-400 CFM

Engineer/shop drawings to reconcile; do not silently resize measured branches.

M101 / M401
H06 / OPEN

No duct centerline elevations or roof/deck height supplied in reviewed plans

Measure roof and ceiling heights, vertical rises, offsets and all crossing clearances.

M101 / M102
H07 / OPEN

New duct base scope versus note offering existing-duct reuse after approval

Base quote new ducts; quote approved reuse as separate alternate.

M101
H08 / OPEN

Fan timeclock, lighting, RTU interlocks and occupied schedule note overlap

Agree final control matrix and trade responsibility.

M401 / E101
P01 / OPEN

Lint interceptor scheduleqty4 conflicts with5 tubs and one-under-each-tub note

Confirm5 units or issue revised fixture layout.

P101 / P401 / P601
P02 / OPEN

A3012 water heaters; P6011new119gal heater; E101existingheaterrelocation

Engineer/owner to confirm equipment count, new/reuse scope, capacity and feeder.

A301 / P601 / E101
P03 / OPEN

Water-heater outlet120F on P401 versus110F revised note on P601

Confirm storage/mixed distribution and point-of-use setpoints.

P401 / P601
A01 / OPEN

Most ceiling elevations not dimensioned; restroom8ft only

Confirm ceiling elevations and resulting board/stud heights. 8ft reference display is not a measured height.

A201 / A101
A02 / OPEN

Gross2011SF and ventilation-room areas differ from net finish polygons/printedA301areas

Retain gross, printed net and traced net separately; verifygrooming clear area.

A000 / A301 / M401
A03 / OPEN

Restroom new in A000 narrative butexisting/NIC in A101/A301/P101

Confirm retained restroom scope and any accessibility upgrade required.

A000 / A101 / A301 / P101
A04 / OPEN

Existing ceilings retained while newRCP adds areas andlights

Reconcile new vs retained ACT polygons before ordering tiles/grid.

A100 / A201
E01 / OPEN

Architectural fixture schedule and September E601 fixture models/controls need reconciliation

Use latest electrical device schedule for procurement; confirm counts,track lengths and camera vendor.

A201 / E102 / E601
E02 / OPEN

Electrical panel identifiersL2 vs A circuit labels and water-heater feed assumptions

Field verify panels, spare capacity and circuit connections.

E101 / E601
R01 / OPEN

Roof openings require landlord/owner roofing coordination; roof elevation and condition absent

Field verify intake/exhaust 10 ft separations, curb supports and flashings; structural engineer review as required.

M000 / M102
P04 / OPEN

P101 caption1/4in scale but plan background registers approximately13.5PDFpoints/ft to A101;1-1/4in trunk vs1-1/2in WH note

Calibrated route traces used. Verify supply/drop sizes and field lengths before fabrication.

P101 / P401
A20 / OPEN

A101 overall 61 ft 11 in dimension disagrees with its detailed dimension-line endpoints at the independently checked 3/16 in scale (about 62.880 ft / difference11.56in).

Architect/field verify overall and dimension chain. Preserve detailed calibrated XY; do not uniformly rescale or use the overall as a fabrication control.

A101
H09 / OPEN

Scheduled S-2 12 x 12 in face and TMS-AA designation need an exact product selection.

Confirm material, frame, module and exact model with engineer and supplier. Keep the scheduled face and count pending clarification.

M401 / product submittal pending
05 / SOURCE & REVIEW BASIS

Trace the scope
to the drawings.

Client architectural and MEP drawing set (identity withheld)
Architectural issue July 21, 2026; MEP revision 04, September 16, 2026
No separate document ID was assigned in source-manifest.json; private PDF hash plus physical page is the evidence locator.

Source sheet and physical PDF page register
SheetSource titlePhysical PDF page
A000Cover1
A100Demo Plan8
A101Construction Plan, Schedules & Details9
A201RCP & Power Plan10
A301Finish & Furniture Floor Plans & Schedules11
A401Interior Elevations12
A501Door, Transition and Shelving Details13
A601General Details14
A701Millwork Details15
P101Plumbing Floor Plan18
P401Plumbing Riser Diagram19
P501Plumbing Details20
P601Plumbing Schedules21
M101Mechanical Floor Plan24
M102Mechanical Roof Floor Plan25
M301Mechanical Details26
M401Mechanical Schedules27
E101Electrical Power Floor Plan31
E102Electrical Lighting Floor Plan32
E103Electrical Roof Floor Plan33
E501Electrical Details34
E601Electrical Single Line and Panel Schedules35
EN001Energy Compliance Forms36
EN002Energy Compliance Forms37

Source PDF SHA-256
376b0c255165e00039c785d8008a16410c03d73ceaf9f8932fbe8e34a5941f00

WG04 quantity report; mechanical route classification reconciled to the dedicated schedule

What has been checked

Original A101 physical PDF page 9 independently reconstructs new wall W01 at 28.893363 LF, matching the model / ledger at displayed precision. The public render is pixel-identical to its matching source model image. Main mechanical routes also have separate original-PDF comparisons.

What remains open

Source schedule and arithmetic reconciliation do not independently remeasure every line. The overall A101 dimension discrepancy, heights, fixture conflicts and field interfaces remain open. No priced or approved bid is claimed.

  • Most ceiling, wall, deck and MEP placement heights are not dimensioned; 8/8.5/10.5/13-ft model values are not verified installation dimensions. Only existing restroom ceiling 8 ft is documented.
  • A101 overall dimension conflicts with detailed calibrated geometry; retain open A20 and do not uniformly rescale.
  • Board, paint and FRP surface quantities use stated height allowances. Stud/gauge/bracing/backing and rough-opening details need actual final conditions.
  • Plumbing P101 printed scale conflicts with registered background scale; horizontal paths use 13.5 PDF pt/ft registration. Vertical drops/risers and tie-ins remain unresolved.
  • Electrical branch wire/conduit routing and HVAC vertical quantities remain null, not zero. Several other unknowns are explicit 1-LS scope holds, not firm physical quantities.
  • New/retained ACT, latest electrical fixture selections/counts, heater count/new-reuse duty, lint interceptor count and MEP interfaces need coordination.
  • Deferred fire protection/alarm, exterior signs and field-dependent roof scope are not measured final systems.
  • Owner/reference furniture schedules, repeated electrical details, purchase allowances and parent installation scope must not be summed twice.
  • The current source register covers 37-sheet scope; it is not evidence that every source quantity received an independent second measurement.
  • The commercial and mechanical pages are two views of this same anonymous project. Mechanical quantities are shared, not added twice.
  • The full 195-entry ledger contains reference schedules and allowance rows. It is not 195 additive procurement items.
  • Original client plans, addresses, personnel, supplier pricing and private project links are omitted.

Client names, project addresses, original plans, contact details, rates and private links are omitted. No final construction price is published.

Download anonymous quantity data ↓

YOUR NEXT SET OF PLANS

A scope you can inspect.
A workup you can use.

Send the plans, trade and deadline to start your measured package.

Send your plans ↗